38.5.108    OTHER DATA RELIED ON

(1) If the public utility has relied on data other than those in Statements A through N (see ARM 38.5.121 through 38.5.180) in support of its rate increase, such other data, appropriately identified and designated as such and separately stated, shall be submitted in addition to the data required by Statements A through N.

History: Sec. 69-3-103, MCA; IMP, Sec. 69-2-101, MCA; NEW, Eff. 7/5/77.