HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 17.24.1816 Prev     Up     Next    
Rule Title: RECLAMATION PLAN: ADDITIONAL SPECIFIC REQUIREMENTS
Add to My Favorites
Add to Favorites
Department: ENVIRONMENTAL QUALITY
Chapter: RECLAMATION
Subchapter: Rules and Regulations Governing the Montana Strip and Underground Mine Siting Act
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

17.24.1816    RECLAMATION PLAN: ADDITIONAL SPECIFIC REQUIREMENTS

The applicant shall submit construction and reclamation plans for all intended preparatory work. Such plans shall be capable of meeting all applicable requirements which would be included in an application for permit under Title 82, chapter 4, part 2, MCA. Such plans shall include:

(1) a map showing proposed locations of railroad loops, spurs or extensive waste and refuse areas, coal handling facilities, office and maintenance buildings, all roads, dragline erection sites and other related disturbances;

(2) the estimated depths of all cuts or excavations and fills needed for on-site construction;

(3) overall dimensions for coal handling facilities, office or maintenance buildings and railroad loops insofar as disturbance is concerned;

(4) photographic transects of the proposed mine facility area.   Photographic points and direction shall be located on an accompanying map.   Estimated depths of proposed cuts and fills shall be identified on each photograph containing areas where cuts and/or fills are anticipated;

(5) a detailed plan, including timetables, showing the method and manner of reclaiming all disturbances related to preparatory work.   Such plans shall include a description of the method and manner of reclaiming land affected by construction of railroad loops, office and maintenance areas, coal handling facilities and other disturbances associated with such preparatory work;

(6) an estimate of water usage expected to result from preparatory work activities, as well as a detailed narrative of planned procurement for such water.   This narrative shall document that the water rights of other landowners will not be adversely affected;

(7) further information as the department may require.   The department will notify the applicant in writing as to what additional information is required.

 

History: 82-4-112, MCA; IMP, 82-4-122, MCA; NEW, Eff. 4/4/75; TRANS, from DSL, 1996 MAR p. 2852; AMD, 2024 MAR p. 260, Eff. 2/10/24.


 

 
MAR Notices Effective From Effective To History Notes
17-432E 2/10/2024 Current History: 82-4-112, MCA; IMP, 82-4-122, MCA; NEW, Eff. 4/4/75; TRANS, from DSL, 1996 MAR p. 2852; AMD, 2024 MAR p. 260, Eff. 2/10/24.
4/4/1975 2/10/2024 History: 82-4-111, 82-4-112, MCA; IMP, 82-4-122, MCA; NEW, Eff. 4/4/75; TRANS, from DSL, 1996 MAR p. 2852.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security