17.36.802 FEE SCHEDULES (1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:
|
UNIT
|
UNIT COST
|
TYPE OF LOTS
|
|
|
Subdivision lot
|
lot/parcel
|
$75
|
Condominium/trailer court/recreational camping vehicle campground
|
unit/space
|
$30
|
Resubmittal fee – previously approved lot, boundaries are not changed
|
lot/parcel
|
$50
|
TYPE OF WATER SYSTEM
|
|
|
Individual or shared water supply system (existing and proposed)
|
unit
|
$50
|
|
|
|
Multiple user system
- new system
- connection to approved
existing distribution
system
- extension to existing
distribution system
- new distribution system
|
|
$250 (plus $50/hour for review in excess of five hours)
|
Public water system
New system per DEQ-1
- connection to existing system
- extension of existing system
- new distribution system
|
component
lot/structure
lot/structure
lot/structure
|
|
TYPE OF WASTEWATER DISPOSAL
|
|
|
|
|
|
|
|
|
New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, and nutrient removal
|
|
$150 (plus $50/hour for review in excess of three hours)
|
|
|
|
Drainfields for pressured-dosed, intermittent sand filter, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, and nutrient removal
|
|
|
Multiple user wastewater system
- connection
- extension
- new collection system
|
|
|
New public wastewater system per DEQ-2
- New connection to existing
system
- New extension to existing
public wastewater system
- New public wastewater
collection system
|
|
|
|
|
|
|
|
$100
(plus $50/hour for review in excess of two hours)
|
|
|
$100 (plus $50/hour for review in excess of two hours)
|
|
|
|
Reissuance of original approval statement
|
|
|
Municipal facilities exemption checklist (former master plan exemption)
|
|
|
Nonsignificance determinations/categorical exemption reviews
- individual/shared systems
- multiple-user and public systems
|
|
|
Storm drainage plan review
- plans exempt from Circular DEQ-8
|
|
$ 25
$ 50 (plus $50/hour for review in excess of one hour)
|
Preparation of environmental
assessments/environmental
impact statements
|
|
|
History: 76-4-105, MCA; IMP, 76-4-105, 76-4-128, MCA; NEW, EMERG, Eff. 5/15/75; NEW, Eff. 9/5/75; AMD, Eff. 5/6/76; AMD, EMERG, 1977 MAR p. 536, Eff. 9/6/77; AMD, 1977 MAR p. 750, Eff. 10/25/77; AMD, 1980 MAR p. 2967, Eff. 11/29/80; AMD, 1981 MAR p. 1288, Eff. 10/30/81; AMD, 1983 MAR p. 851, Eff. 7/15/83; AMD, 1984 MAR p. 1027, Eff. 7/13/84; AMD, 1992 MAR p. 2145, Eff. 9/25/92; AMD, 1993 MAR p. 542, Eff. 4/16/93; TRANS, from DHES, 1996 MAR p. 1499; AMD, 1998 MAR p. 646, Eff. 3/13/98; AMD, 2002 MAR p. 1465, Eff. 5/17/02.
|