17.36.802    FEE SCHEDULES

(1) An applicant for approval of a division of land into one or more parcels, condominiums, mobile home/trailer courts, recreational camping vehicle spaces, and tourist campgrounds shall pay the following fees:

 

 

UNIT

UNIT COST

 

TYPE OF LOTS

 

 

 

Subdivision lot

 

lot/parcel

 

$ 125

Condominium/trailer court/recreational camping vehicle campground

unit/space

$ 50

Resubmittal fee – previously approved lot, boundaries are not changed

lot/parcel

$ 75

 

TYPE OF WATER SYSTEM

 

 

 

Individual or shared water supply system (existing and proposed)

 

unit

 

$ 85

 

Multiple user system (non-public)

- new system

 

 

 

 

 

- new distribution system design

- connection to distribution system

 

each

 

 

 

 

 

lineal foot

lot/unit

 

$ 315 (plus $105/hour for review in excess of four hours)

 

$ 0.50

$ 70

Public water system

New system per DEQ-1

 

 

 

- new distribution system design

- connection to distribution system

 

component

 

 

 

lineal foot

lot/structure

 

per ARM 17.38.106 fee schedule

 

$ 0.50

$ 70

 

TYPE OF WASTEWATER DISPOSAL

 

 

 

Existing systems

 

unit

 

$ 75

New gravity fed system

drainfield

$ 95

New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems

design

 

 

 

 

 

$ 190 (plus $105/hour for review in excess of two hours)

 

New pressure-dosed, elevated sand mound, ET systems, intermittent sand filter, ETA systems, recirculating sand filter, recirculating trickling filter, aerobic treatment unit, nutrient removal, and whole house subsurface drip irrigation systems

drainfield

$ 50

UNIT

 

UNIT COST

Gray water reuse systems. This is a stand-alone fee and all gray water reuse systems will be reviewed at the unit cost

unit

$ 95 (plus $105/hour in excess of two hours)

Multiple user wastewater system (non-public)

- new collection system design

- connection to collection system

 

 

lineal foot

lot/unit

 

 

$ 0.50

$ 70

New public wastewater system per DEQ-2

 

 

 

- new collection system design

- connection to collection system

component

 

 

 

lineal foot

lot/structure

per ARM 17.38.106 fee schedule

 

$ 0.50

$ 70

 

OTHER

 

 

 

 

 

Deviation from circular

 

 

request or per design

 

$ 200 (plus $105/hour for review in excess of two hours)

Waiver from rule

request

$ 200 (plus $105/hour for review in excess of two hours)

Reissuance of original approval statement

request

$ 60

Municipal facilities exemption checklist (former master plan exemption)

application

$ 100

 

UNIT

 

UNIT COST

Nonsignificance determinations/categorical exemption reviews

- individual/shared systems

 

- multiple-user non-public systems

 

- public systems

 

 

drainfield

 

lot/structure

 

drainfield

 

 

$ 60

 

$ 30

 

per ARM 17.38.106 fee schedule

Storm drainage plan review

 

- plans exempt from Circular DEQ-8

 

- Circular DEQ-8 review

 

 

 

 

lot

 

design

 

lot

 

 

$ 40

 

$ 180

 

$ 40 (plus $105/hour for review in excess of 30 minutes per lot)

Preparation of environmental

assessments/environmental

impact statements

----

actual cost

History: 76-4-105, MCA; IMP, 76-4-105, 76-4-128, MCA; NEW, EMERG, Eff. 5/15/75; NEW, Eff. 9/5/75; AMD, Eff. 5/6/76; AMD, EMERG, 1977 MAR p. 536, Eff. 9/6/77; AMD, 1977 MAR p. 750, Eff. 10/25/77; AMD, 1980 MAR p. 2967, Eff. 11/29/80; AMD, 1981 MAR p. 1288, Eff. 10/30/81; AMD, 1983 MAR p. 851, Eff. 7/15/83; AMD, 1984 MAR p. 1027, Eff. 7/13/84; AMD, 1992 MAR p. 2145, Eff. 9/25/92; AMD, 1993 MAR p. 542, Eff. 4/16/93; TRANS, from DHES, 1996 MAR p. 1499; AMD, 1998 MAR p. 646, Eff. 3/13/98; AMD, 2002 MAR p. 1465, Eff. 5/17/02; AMD, 2009 MAR p. 2477, Eff. 12/25/09; AMD, 2013 MAR p. 1827, Eff. 10/18/13