HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Rule: 17.8.1806 Prev     Up     Next    
Rule Title: GENERAL OPERATING REQUIREMENTS
Add to My Favorites
Add to Favorites
Department: ENVIRONMENTAL QUALITY
Chapter: AIR QUALITY
Subchapter: Standards and Requirements for Sand and Gravel, Concrete, and Asphalt
 
Latest version of the adopted rule presented in Administrative Rules of Montana (ARM):

Printer Friendly Version

17.8.1806    GENERAL OPERATING REQUIREMENTS

(1) Registration of a facility under this subchapter does not relieve an owner or operator of the responsibility to comply with:

(a) applicable federal, state, or local statutes, rules, or orders; and

(b) control strategies contained in the Montana State Implementation Plan.

(2) The department may require an owner or operator to conduct a test, emission or ambient, under ARM 17.8.105. Emission source testing must comply with ARM 17.8.106.

(3) An owner or operator of a facility required to be registered under this subchapter:

(a) shall install, operate, and maintain all equipment to provide the maximum air pollution control for which it was designed;

(b) shall employ dust suppression control that is installed, maintained, and operated to ensure that the facility complies with this chapter. Dust suppression control for crushing, screening, and/or conveyor transfer points consisting of water spray bars and/or chemical dust suppression must be operating if any visible emissions equal to or greater than 10 percent opacity averaged over six consecutive minutes are present;

(c) shall allow the department's representatives access to the operations at any facility at all reasonable times to inspect or conduct surveys, collect samples, obtain data, audit any monitoring equipment or observe any monitoring or testing, and otherwise conduct all necessary functions related to the administration of this chapter; and

(d) may not operate an engine that is subject to the requirements of this subchapter at any permanent location when the combined horsepower hours of those sources exceed the following limits:

(i) 6,000,000 horsepower-hours per rolling 12-month period; or

(ii) 3,500,000 horsepower-hours per rolling 12-month period, if an asphalt plant is also located at the permanent location.

 

History: 75-2-111, 75-2-234, MCA; IMP, 75-2-234, MCA; NEW, 2019 MAR p. 425, Eff. 4/27/19.


 

 
MAR Notices Effective From Effective To History Notes
17-402 4/27/2019 Current History: 75-2-111, 75-2-234, MCA; IMP, 75-2-234, MCA; NEW, 2019 MAR p. 425, Eff. 4/27/19.
Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security