(1) Each proposed solid waste management system
will be evaluated on a case-by-case basis, taking into consideration the
physical characteristics of the system, the types and amounts of wastes, and
the operation and maintenance plan for that system.
(2) The operation and maintenance plan shall
include:
(a) if for use by the public, what days and times
the components of the system will be open;
(b) how access and traffic will be restricted or
controlled;
(c) proposed equipment the system will utilize;
(d) general description of the proposed solid
waste management system;
(e) maintenance schedule concerning solid waste
handling and disposal;
(f) provision for litter control, if applicable;
(g) types of waste the proposed facility will
accept; and
(h) plan for reclamation of the disposal facility
and the land's ultimate use as required under ARM 17.50.530.
(i) any methane monitoring plans required under
ARM 17.50.511;
(j) any ground water monitoring plan required
under ARM 17.50.701, et seq.; and
(k) any plans required for composting or for
handling of special waste streams.