HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
This is an obsolete version of the rule. Please click on the rule number to view the current version.

17.74.360    RECORDKEEPING

(1) Records of asbestos projects that are being, or have been, conducted must be retained for at least 30 years and made available to the department upon request.

(2) Records must be retained and made available to the department by:

(a) the asbestos project contractor/supervisor for the project; or

(b) the owner of the facility in which the project is being or has been conducted if the owner is accredited by the department and is conducting the project without a contractor/supervisor.

(3) Records of asbestos projects must include, but are not limited to, the following:

(a) the name, address, and accreditation identification number of the person who supervised each asbestos project, and of each person who worked on the project;

(b) the location and description of each project and the amount of RACM that was enclosed, removed, repaired, encapsulated, or placed in new construction;

(c) the starting and completion dates of each instance of enclosure, removal, repair, encapsulation, or placement in new construction;

(d) the name and address of each facility where waste RACM was deposited for disposal. Holders of annual permits are not required to maintain records designating where wastes from specific asbestos projects are deposited, but holders of annual permits shall maintain records of each shipment of RACM;

(e) a receipt from each disposal facility indicating the amount of RACM deposited at the site and the date of the deposit; and

(f) the transportation manifest records indicating the amount of RACM transported to each approved asbestos disposal facility and the name and location of each facility.

History: 75-2-503, MCA; IMP, 75-2-513, MCA; NEW, 2006 MAR p. 1574, Eff. 6/23/06.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security