HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
This is an obsolete version of the rule. Please click on the rule number to view the current version.

24.225.921    CERTIFIED EUTHANASIA AGENCY INSPECTION CRITERIA - NOTIFICATION OF DEFICIENCIES AND CORRECTIONS

(1) An inspection of a CEA must be conducted annually by the board or a person authorized by the board with its full authority.

(2) The inspection must include:

(a) verification that the area and equipment is appropriate for animal euthanasia;

(b) verification of the correct security, storage, disposal and labeling of euthanasia drugs;

(c) verification of correct drug record keeping;

(d) appropriate sanitation; and

(e) any other condition that the board determines is relevant to the proper euthanasia of animals.

(3) If the inspector determines that a deficiency substantially affects the public health, safety, or welfare or jeopardizes animals under the control of the CEA, the inspector must immediately inform law enforcement and the board which may summarily suspend the CEA's certificate pursuant to 2-4-631 , MCA and applicable Montana law. If a less serious deficiency is found after inspection, it must be communicated to the agency and the board in writing. The CEA must correct any such deficiency within 30 days from the date of the inspection. If a second inspection is required, a second inspection fee must be paid by the agency. Failure to sufficiently correct a noted deficiency will be addressed as a disciplinary matter by the screening panel of the board and the board may notify the DEA.

History: 37-1-131, 37-18-202, 37-18-603, MCA; IMP, 37-18-603, MCA; NEW, 2004 MAR p. 1324, Eff. 6/4/04; TRANS, from Commerce, 2005 MAR p. 323.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security